Mon–Fri 8:30–5:00

Pave-Wayof Augusta, Aiken, Inc.There Is No Substitute for Quality · Since 1978

Parking Lot Paving, Resurfacing & Striping

New and replacement asphalt parking lots, resurfacing, sealcoating, striping and ADA-compliant layout for retail, office, church, medical and industrial property.

  • New parking lot construction
  • Resurfacing and overlay
  • Sealcoating
  • Patching and pothole work
  • Striping and re-striping
  • ADA layout and signage

A parking lot is the first thing a customer touches and the last thing most property owners budget for. It is also, unlike most of a building, something that fails visibly and gradually — which means it is usually fixable long before it becomes a reconstruction.

Pave-Way has built and maintained commercial lots across the CSRA since 1978, for retail, office, church, medical, industrial and multi-family property, on both sides of the river.

What we do

New parking lot construction. Clearing, grading, drainage, base, paving, curb and striping — the whole package, with our own crews.

Resurfacing and overlay. New asphalt over a sound existing base, where the failure is confined to the surface.

Reconstruction. Full removal and rebuild where the base has gone.

Sealcoating. Protecting the surface from oxidation and water penetration.

Patching and pothole work. Cut out, rebuild and replace, rather than throwing material into a hole and rolling over it.

Striping and re-striping. Layout, stalls, directional markings, fire lanes, loading zones.

ADA layout. Accessible stalls, access aisles, routes, slopes, signage and markings to current requirements.

Curb and gutter, sidewalks and islands. Poured by the same crews, tied into the storm system we install.

The base is the whole job

Asphalt is a wearing surface. It is not structural on its own — what carries the load is the base underneath, and what destroys the base is water.

Water enters through a crack, an unsealed edge, or saturated ground alongside the lot. It washes fine material out of the base, leaving a void. The asphalt over that void has nothing supporting it, so it flexes under traffic, then cracks in a pattern that looks like alligator hide, then breaks up into a pothole. Fill the pothole and the void is still there, so it returns in the same spot.

That is why we look at where the water goes before quoting anything. A lot that holds standing water after rain has a drainage problem, and paving over a drainage problem is buying the same lot twice.

Knowing which job you actually need

We would rather sell you the smaller job that works than the bigger job that sounds thorough.

  • Sealcoating and striping — surface is sound, drains properly, just tired and worn. Maintenance.
  • Patching — isolated failures in an otherwise sound lot. Cut out, rebuild the base locally, replace.
  • Resurfacing — surface widely worn or cracked, base still sound and draining. New asphalt over the top.
  • Reconstruction — widespread alligator cracking, recurring potholes, standing water, failures returning in the same places. The base is gone and an overlay will not save it.

The failure pattern tells you which one you are in, and we will walk the lot with you and show you why.

Permitting and access

Commercial lot work in Richmond County generally goes through site plan review, with land disturbance permitting once you are disturbing an acre or more, and stormwater review triggered by added impervious area. Aiken County and the City of Aiken run comparable processes. Work touching a state route may need GDOT or SCDOT review of the access.

Resurfacing that does not change the footprint or the drainage is a much lighter process than new construction. We deal with both jurisdictions routinely and will tell you which category you are in early, rather than after you have committed.

Keeping you open while we work

Most of our commercial customers cannot close. We phase lots in sections, work nights and weekends where the property needs it, and plan the sequence with you before mobilising so you know which rows are down and when.

Bonded, licensed and insured in both Georgia and South Carolina. We own our equipment and run our own crews — no subcontracted paving.

Free estimates from either office.

Common questions

What permits does a commercial parking lot need in Richmond County?
For new construction, expect site plan review, a grading permit, erosion and sediment control, and stormwater review triggered by the impervious area you are adding. Access onto a state route may bring GDOT in separately. A resurfacing job that changes neither the footprint nor the drainage is a far lighter process, and that distinction drives your schedule more than anything else. Our guide on parking lot permits in Richmond County sets out both paths.
Should I resurface or replace?
It depends on whether the base is sound. Resurfacing puts new asphalt over old and is a good value when the failure is confined to the surface — oxidation, minor cracking, worn texture. It is money wasted when the base underneath has failed, because the new surface will crack in the same places within a couple of years. The tell is what the failures look like. Widespread alligator cracking, potholes that keep coming back in the same spot, or areas that hold water after rain generally mean the base is gone and an overlay will not save it. We will tell you honestly which one you have.
How long will my lot be closed?
Less time than most people expect, and we can usually phase it. Striping alone is often overnight. Sealcoating typically needs the surface closed for a day. Resurfacing depends on area but is frequently done in sections so part of the lot stays open. Full reconstruction takes longest because the base work is the slow part. For retail, medical and church properties we routinely work nights and weekends to keep the business running, and we plan the phasing with you before we mobilise.
How often should a parking lot be sealcoated?
Every few years for most commercial lots, though it depends on traffic, sun exposure and how the lot drains. Sealcoating is maintenance, not repair — it protects the surface from oxidation and water penetration and keeps the lot looking maintained. It will not fix a structural problem, and sealing over a failing base just makes a failing base look tidy for a season.
Do you handle ADA compliance?
Yes. Accessible stall count and dimensions, access aisles, routes from parking to entrance, slope requirements, signage and pavement markings. It is one of the most common things we find wrong on older lots, usually because the lot predates the requirements or was re-striped at some point by somebody working from the old layout. We lay it out to current requirements as part of the job.

Related work

Free estimates, either office

Tell us about the site and we’ll come look at it. No obligation, and no charge for the estimate.

Request an estimate

Call Augusta(706) 724-3342Call Aiken(803) 642-9242